murattunalı.
Reading

Nothing is “done” until measured.

No team page. A method page.

APPROACH — METHOD PAGE 00 / 02

How we work matters more than who we are. Here we set out our working principles and the standards we follow.

Under every principle below sits a guard that protects it, and you can break that guard from here on purpose. Or audit this page right now, in your own browser: your device measures the numbers below.

Get your site machine-read →

THE METHOD, ON ONE PROJECT · KARCEM · DESIGN + DEVELOPMENT

SUITE — AT BUILD TIME THRESHOLD — NOT A MEASUREMENT

1561 ACTIVE GUARDS

CONTRAST FLOOR
4.5:1
KEYBOARD TOUR
FULL
CLIPPING IN THREE LANGUAGES
0
SCROLL CLS
0,05
SIGNATURE ELEMENT
1

IN THIS BROWSER

A passing test proves nothing. For every guard on record the rule was broken on purpose first, the red was seen, and the violation was reverted.

PROJECT PLAN · 6 STAGES

The same weeks, from your side.

The weeks above are the studio’s desk. Here the same project runs in three rows: what you do, what I do, and what the machine sees that week. At every gate a document lands on the desk; the acceptance criterion is written down.

  1. 00First conversation

    YouYou describe your goals, your markets and your current site.

    MeI measure the current site: speed, index status, structured data.

    MachineHow it reads your site today: robots.txt, sitemap, schema.

    Gate
    Measurement note

    ACCEPTEDWhich service to start with, in writing.

  2. 01Discovery + scope

    YouYou share the content inventory and approve the written scope.

    MeGoals, content and technical ground are set; a written document fixes the scope.

    MachineThe old URLs are inventoried and a redirect map is drawn up.

    Gate
    Scope document

    ACCEPTEDScope and schedule in writing, approved.

  3. 02Art direction

    YouYou approve the concept, the type system and the motion language.

    MeConcept, type and motion language; no production without approval.

    MachineHeading structure and structured data are drawn per template.

    Gate
    Art direction sheet

    ACCEPTEDNothing goes into production without your approval.

  4. 03Build

    YouYou see shared drafts and receive a written report at the end of each stage.

    MeStatic HTML + GSAP/Lenis; performance budgets applied from the start.

    MachineStructured data, hreflang, the sitemap and llms.txt are set up.

    Gate
    Preview

    ACCEPTEDReal-user load < 0.8 s · layout shift 0.

  5. 04Measure + handover

    YouYou receive the handover package: repository access, setup notes, measurement tools.

    MeAccessibility and speed audit; documented, maintainable delivery.

    MachineOn launch day, search engines are notified; the live audit runs.

    Gate
    Measurement report

    ACCEPTEDBudget thresholds and measured results in writing; the measurement tool is yours.

  6. 05After handover

    YouYou update the content yourself or add an update plan.

    MeWhen the site changes, I repeat the measurement with a new date.

    MachineAI crawler visits are read from the server log.

    Gate
    Handover record

    ACCEPTEDCode and content are yours.

TIMELINEA single-language site takes 3–5 weeks, a three-language corporate site 6–10.

HANDOVER RECORD

Everything handed over is yours.

  1. We transfer all code and content sources to you; you are not tied to a locked panel or a subscription.
  2. The handover package includes repository access, setup notes and the measurement tools.
  3. Text and image sources sit in plain files; making a change and running the generator is one command.
  4. If you have no developer, an update retainer can be added — but you are never tied to a locked panel.
  5. A static build is the most direct way to hold the performance budget (LCP < 0.8s, CLS 0): no plugins running on a server, no version upgrades, no attack surface.
  6. If you have a content, marketing or engineering team, we build on top of their work; the handover includes a layer of rules (design tokens, schema at template level, pre-release audit steps) so the decisions survive after you take over.